Engineering, construction, civil works and electromechanical assembly of the South Thermoelectric Plant
(Yaguacua-Tarija)
100% made under EPC. Four Siemens SGT-800 turbines were installed and a substation was built.
Benefit: Injecting 188 megawatts (MW) ISO into the National Interconnected System (SIN).
Extension of the combined cycle of the Del Sur thermoelectric plant
(Yaguacua-Tarija)
Two gas turbines and one steam turbine
Benefit: Upon completion, the plant will add an effective power of 480 MW ISO to SIN
Engineering, construction, civil works and assembly of the Warnes Thermoelectric Plant
100% made under EPC. Five Siemens SGT-800 turbines were installed and the central substation
Benefit: 200 megawatts (MW) are injected into the National Interconnected System (SIN)
Extension of single cycle to combined cycle of the Warnes Thermoelectric Plant
They will install two new modules. It is expected to open in 2019
Benefit: It will inject 280 megawatts (MW) into the SIN and together with 200 MW, will generate 480 MW of power
Design, staking and construction of 40 km of lines for the Ichilo-Santa Cruz province
More than six sections of the Ichilo River were crossed and paths opened in several places
Benefit: More than 100 families from 11 communities connected to electricity.
Electrical maintenance of all Halliburton facilities
A comprehensive review of the electrical system was made in order to make corrections
Benefit: The oil company carries out its activities with lower risk of electric cuts
Service of repair and maintenance of the existing electrical system in YPFB Transporte S.A.
The ESE team provided services at other YPFB Transport plants
Benefit: The oil company carries out its activities with lower risk of electric cuts
Installation of protective equipment, measurement, cells in medium tension and transformers 2000 KVA.
They were incorporated high-tech equipment
Benefit: More than a dozen provinces had access to electric energy.
Assembling of connection in medium voltage, protection, measurement and transformers in plant of aggregates.
The service and the assembly took place in its facilities of the industrial park of Santa Cruz
Benefit: The plant has a production capacity of 120000 ml of joists and 9000m3 of plastoform
Study, provision and installation of equipment against atmospheric discharges
The equipment were prepared in Batteries Ñupuco and previously in the plant of Naranjillos, in Tarija
Benefit: This oil firm has protection for rainy and stormy seasons
Construction of the power generation system in Ascension of Guarayos, with 4 MW of power
It has three Caterpillar generators, a control room and storage tanks for diesel
Benefit: Around 564 communities of San Julián, Urubichá, El Puente, Concepción, San Javier, San Ramón, among others.
Design, construction and assembly of power distribution lines for irrigation system
The line was made almost 100 km in a record time of three months.
Benefit: The company performs its system of pumping and cultivation during the night and with greater precision.
Assembly of automatic machine noodle dryer C-3000 which is located in the industrial park.
ESE previously installed the medium voltage electric generation plant
Benefit: The company can operate the equipment without any problems.
Extension of line in medium voltage for Campo Grande and GIJA
Previously, ESE performed the electrical maintenance to the stations of understanding of this firm
Benefit: The personnel in both projects can operate without problems in the electrical system
Pre-design, design, staging and construction of the electrical grids of the Santa Cruz integrated system and isolated systems
It was carried out in de-energized lines, live line and underground electrical grids in medium and low voltage
Benefit: More than a dozen provinces have access to electricity
Construction of civil works and electromechanical assembly of the El Kenko II plant
Assembly of Rolls Royce Trent-60 turbines
Benefit: Provides electric power coverage to the northern area of La Paz and El Alto
Interconnection of Tarija to the National Interconnected System (SIN), 230 kV
It was developed as an EPC with lines in three substations
Benefit: Hundreds of families from Potosí, Chuquisaca and Tarija.
Interconnection of Tarija to the National Interconnected System (SIN), 230 kV
It was developed as an EPC with lines in three substations
Benefit: Hundreds of families from Potosí, Chuquisaca and Tarija.
Design, supply and construction of 24.9kV MT lines Trinidad-San Ramón
It was performed at a voltage level of 24.9 kV and a length of 220 km
Benefit: Dozens of communities accessed electricity between Trinidad and San Ramón
Construction of MT and BT distribution electrical grids of 36 km for the Asaí condominium
Lines were built with an installed power of 250 kVA
Benefit: Dozens of families living inside the condominium