Engineering, construction, civil works and electromechanical assembly of the South Thermoelectric Plant
(Yaguacua-Tarija)

100% made under EPC. Four Siemens SGT-800 turbines were installed and a substation was built.

Benefit: Injecting 188 megawatts (MW) ISO into the National Interconnected System (SIN).

Extension of the combined cycle of the Del Sur thermoelectric plant
(Yaguacua-Tarija)

Two gas turbines and one steam turbine

 

 

Benefit: Upon completion, the plant will add an effective power of 480 MW ISO to SIN

 

Engineering, construction, civil works and assembly of the Warnes Thermoelectric Plant

100% made under EPC. Five Siemens SGT-800 turbines were installed and the central substation

Benefit: 200 megawatts (MW) are injected into the National Interconnected System (SIN)

Extension of single cycle to combined cycle of the Warnes Thermoelectric Plant

They will install two new modules. It is expected to open in 2019

 

Benefit: It will inject 280 megawatts (MW) into the SIN and together with 200 MW, will generate 480 MW of power

 

Design, staking and construction of 40 km of lines for the Ichilo-Santa Cruz province

More than six sections of the Ichilo River were crossed and paths opened in several places

 

Benefit: More than 100 families from 11 communities connected to electricity.

Electrical maintenance of all Halliburton facilities

A comprehensive review of the electrical system was made in order to make corrections

 

Benefit: The oil company carries out its activities with lower risk of electric cuts

 

Service of repair and maintenance of the existing electrical system in YPFB Transporte S.A.

The ESE team provided services at other YPFB Transport plants

Benefit: The oil company carries out its activities with lower risk of electric cuts

Installation of protective equipment, measurement, cells in medium tension and transformers 2000 KVA.

They were incorporated high-tech equipment

 

 

Benefit: More than a dozen provinces had access to electric energy.

 

Assembling of connection in medium voltage, protection, measurement and transformers in plant of aggregates.

The service and the assembly took place in its facilities of the industrial park of Santa Cruz

Benefit: The plant has a production capacity of 120000 ml of joists and 9000m3 of plastoform

Study, provision and installation of equipment against atmospheric discharges

The equipment were prepared in Batteries Ñupuco and previously in the plant of Naranjillos, in Tarija

 

Benefit: This oil firm has protection for rainy and stormy seasons

 

Construction of the power generation system in Ascension of Guarayos, with 4 MW of power

It has three Caterpillar generators, a control room and storage tanks for diesel

Benefit: Around 564 communities of San Julián, Urubichá, El Puente, Concepción, San Javier, San Ramón, among others.

Design, construction and assembly of power distribution lines for irrigation system

The line was made almost 100 km in a record time of three months.

 

Benefit: The company performs its system of pumping and cultivation during the night and with greater precision.

 

Assembly of automatic machine noodle dryer C-3000 which is located in the industrial park.

ESE previously installed the medium voltage electric generation plant

Benefit: The company can operate the equipment without any problems.

Extension of line in medium voltage for Campo Grande and GIJA

Previously, ESE performed the electrical maintenance to the stations of understanding of this firm

Benefit: The personnel in both projects can operate without problems in the electrical system

 

Pre-design, design, staging and construction of the electrical grids of the Santa Cruz integrated system and isolated systems

It was carried out in de-energized lines, live line and underground electrical grids in medium and low voltage

Benefit: More than a dozen provinces have access to electricity

Construction of civil works and electromechanical assembly of the El Kenko II plant

Assembly of Rolls Royce Trent-60 turbines

 

 

Benefit: Provides electric power coverage to the northern area of La Paz and El Alto

 

Interconnection of Tarija to the National Interconnected System (SIN), 230 kV

It was developed as an EPC with lines in three substations

Benefit: Hundreds of families from Potosí, Chuquisaca and Tarija.

Interconnection of Tarija to the National Interconnected System (SIN), 230 kV

It was developed as an EPC with lines in three substations

 

 

Benefit: Hundreds of families from Potosí, Chuquisaca and Tarija.

 

Design, supply and construction of 24.9kV MT lines Trinidad-San Ramón

It was performed at a voltage level of 24.9 kV and a length of 220 km

 

Benefit: Dozens of communities accessed electricity between Trinidad and San Ramón

Construction of MT and BT distribution electrical grids of 36 km for the Asaí condominium

Lines were built with an installed power of 250 kVA

 

Benefit: Dozens of families living inside the condominium